Quayside

The Quay allows PFP to provide stevedoring operations under our control and supervision for deep-sea vessels and or supply boats.

Cargo handling will be undertaken for IOC’s and their service companies, or ship-owners who have parcels destined for the Onne Free Zone.

Onshore Logistics

PFP’s specifically designed operating centre is a port facility second to none, handling the modern requirements of the oil and gas producing and service trades.

  • Reciept
  • Storage
  • Onward Transportation

Equipment List

Lifters

3 x Freight Lifters

Cranes

2 x Manitowoc 50 tonnes SWL - 2 x Manitowoc 200 tonnes SML
2 x PPM 60 tonne SWL - 2 x Grove 80 tonnes SWL

Fork Lifts

1 x 32 ton - 1 x 25 ton - 1 x 16 ton - 1 x 10 ton - 5 x 5 tonnes

Trucks and Flatbed Trailers

The single axle prime movers with 40ft. flatbed are the workhorses within the Free Zone and Port Harcourt. They are equipped with stanchions for tubular movement

The double axel panel trucks are primarily used for heavy loads and equipment for interstate transfers. The panel lift off to convert to a 40ft. flatbed

Barges

20x 24m x8m 4.5 draft Capacity 800 tonnes / 1000 CBM